/mz:lifecycle

Orchestrate the full milestone lifecycle: audit verification status, archive the current milestone, collect deferred items, and prepare the next version. Uses existing CLI tools (milestone audit, milestone archive, milestone create, roadmap list, roadmap add-phase) as the execution backbone while providing a guided interactive experience.

Note: This skill handles the entire end-of-milestone flow in a single entry point. When audit finds gaps, it proposes gap-closure phases and exits. When audit passes, it proceeds through archive, deferred item collection, and next-version preparation.

Reference @skills/init/design-system.md for visual output formatting. Reference @skills/shared/presentation-standards.md for content formatting rules. Reference @skills/shared/terminology.md for official term definitions.

Step 1: Display Banner

Output the stage banner:

+===============================================+
|  MEGAZORD > LIFECYCLE                         |
+===============================================+

Step 2: Load Context and Validate

Read .planning/megazord.config.json. If missing, display error and stop:

## Error

Project not initialized — no megazord.config.json found.

`/mz:init`

If config exists, continue loading:

  • Read .planning/STATE.md for current position.
  • Read .planning/ROADMAP.md for phase details.
  • Read .planning/MILESTONE.md if it exists (for version detection and phase scope).

Determine the plugin path for CLI commands:

  1. Read plugin_path from the config JSON.
  2. If plugin_path is not set in config, try ~/.claude/plugins/mz. Check if ~/.claude/plugins/mz/bin/megazord.mjs exists.
  3. If neither exists, display error and stop:
## Error

Plugin path not configured.

`/mz:settings` to set plugin_path, or `/mz:init` to re-initialize.

Parse the user's message (text after /mz:lifecycle) for arguments:

  • --skip-audit -- bypass the audit step entirely (for informal projects)
  • {version} -- specify the milestone version to archive (optional; auto-detected from MILESTONE.md if present)

Use the resolved {plugin_path} for all node {plugin_path}/bin/megazord.mjs commands below.

Step 3: Milestone Status Summary

LOCKED decision: Always show a milestone status summary before proceeding with any destructive action.

  1. Run node {plugin_path}/bin/megazord.mjs tools roadmap list to get all phases.
  2. Run node {plugin_path}/bin/megazord.mjs tools progress for overall progress.
  3. Display a summary box:
+===============================================+
|  Milestone Status                             |
+-----------------------------------------------+
|  Version: {version}                           |
|  Total phases: {N}                            |
|  Completed: {M}/{N}                           |
|  Progress: {percentage}%                      |
|                                               |
|  ✓ Phase 1: {Name} — {functional_sentence}   |
|  ✓ Phase 2: {Name} — {functional_sentence}   |
|  ◆ Phase 3: {Name} — {functional_sentence}   |
|  ○ Phase 4: {Name} — {functional_sentence}   |
+===============================================+

Use status symbols (✓ complete, ◆ in progress, ○ pending) instead of [done] tags. Extract functional sentences from the phase Goal in ROADMAP.md — one line per phase, never a bare phase number.

  1. If no version argument was provided:

    • Check .planning/MILESTONE.md for a version: field in frontmatter. If found, use it.
    • If no MILESTONE.md or no version field, prompt the user: "What version is this milestone? (e.g., v1.0):"
  2. If no completed phases found, display error and stop:

## Error

No completed phases found. Complete at least one phase first.

`/mz:go` to execute the current phase.

Step 4: Audit (or Skip)

If --skip-audit was provided: Display note and jump to Step 6:

> Note: Skipping audit (--skip-audit).

If --skip-audit was NOT provided:

  1. Check for existing MILESTONE-AUDIT.md in .planning/:

    • If found, read it and check the date in the file.
    • If the audit is recent (same day), offer to reuse:
      > Existing audit from {date} found. Reuse? (yes/re-run)
      
    • If user chooses "reuse" and audit passed, proceed to Step 6.
    • If user chooses "reuse" and audit has gaps, proceed to Step 5.
  2. If no existing audit or user wants re-run:

    • Determine phase scope: Read MILESTONE.md for phases: field. If not available, use all completed phases from ROADMAP.md.
    • Run:
      node {plugin_path}/bin/megazord.mjs tools milestone audit --phases "{comma-separated phase numbers}"
      
    • Parse the JSON result.
    • Write the audit results to .planning/MILESTONE-AUDIT.md with version, date, status, and per-phase details.

Step 5: Handle Audit Result

If all_passed is true

Display passed box and proceed to Step 6:

+===============================================+
|  Milestone Audit: PASSED                      |
+-----------------------------------------------+
|  Phases verified: {N}/{N}                     |
|  All verification gates passed.               |
+===============================================+

If gaps found

Display gaps clearly with a per-phase status table:

+===============================================+
|  Milestone Audit: GAPS FOUND                  |
+-----------------------------------------------+
|  Phases verified: {passed}/{total}            |
|                                               |
|  Failed:                                      |
|  - Phase {N}: {Name} — {reason}              |
|  - Phase {M}: {Name} — No VERIFICATION.md    |
+===============================================+

Then propose gap-closure phases:

  1. Group gaps by nature (missing verification, failed verification, etc.).
  2. For each gap group, propose a new phase:
    node {plugin_path}/bin/megazord.mjs tools roadmap add-phase --description "{gap description}"
    
  3. Display:
    > Gap-Closure Proposal
      {N} gap-closure phase(s) proposed to address these gaps.
      After completing them, re-run `/mz:lifecycle` to re-audit.
    
      Proposed phases:
      - Phase {X}: {description}
      - Phase {Y}: {description}
    
      Add these phases? (yes/no)
    
  4. If user confirms:
    • Add phases via CLI tool.
    • Display next steps:
      ## Next Up
      
      **Plan gap-closure Phase {X}: {description}** — address audit gaps
      `/mz:plan {X}`
      
      <sub>`/clear` — start fresh context for the next step</sub>
      
  5. EXIT -- Do NOT proceed to archive when gaps exist.

Step 6: Confirm Archive

Show what will be archived:

+===============================================+
|  Archive Confirmation                         |
+-----------------------------------------------+
|  The following will be archived:              |
|                                               |
|  ROADMAP.md    -> milestones/{ver}-ROADMAP.md |
|  REQUIREMENTS  -> milestones/{ver}-REQUIRE... |
|  phases/       -> milestones/{ver}-phases/    |
|  STATE.md      -> milestones/{ver}-STATE.md   |
|  Git tag: milestone/{version}                 |
+===============================================+

Check for duplicate archive: If milestones/{version}-ROADMAP.md already exists, display warning:

> Warning: Milestone {version} appears already archived.
  Proceeding will overwrite the existing archive.
  Continue? (yes/abort)

If no duplicate (or user confirms override):

Proceed with archive? (yes/no)

Step 7: Execute Archive

  1. Run the archive via CLI:

    node {plugin_path}/bin/megazord.mjs tools milestone archive --version "{version}"
    

    Parse the JSON result to confirm archived files.

  2. Additionally archive STATE.md manually (since archiveMilestone() does not archive STATE.md):

    • Read .planning/STATE.md
    • Write contents to .planning/milestones/{version}-STATE.md
  3. Update MILESTONE.md status from "active" to "archived":

    • Read .planning/MILESTONE.md
    • Replace status: active with status: archived
    • Write back
  4. Display archive confirmation:

    > Archive Complete
      {N} files archived to .planning/milestones/
      Git tag: milestone/{version}
    

Step 8: Collect Deferred Items

LOCKED decision: Collect deferred items from CONTEXT.md files; user selects which to carry forward.

  1. Scan all .planning/phases/*/NN-CONTEXT.md files (glob pattern: .planning/phases/*/*-CONTEXT.md).
  2. For each file:
    • Read the file content.
    • Extract text between <deferred> and </deferred> tags.
    • Parse bullet points (lines starting with - ).
    • Skip entries that are just "None", contain only "None", or match "None -- discussion stayed within phase scope".
  3. Strip phase references from items -- present clean action items, not "Phase 6 (Agent Teams Integration)" prefixes.
  4. If no deferred items found after filtering:
    > No deferred items found across phase contexts.
    
    Skip to Step 9.
  5. If deferred items found, present numbered list:
    > Deferred Items from {version}
    
      1. Git worktree isolation for parallel agents
      2. Reviewer feedback loops during execution
      3. Auto-advance to next phase after completion
      4. Agent Teams review-fix loop with direct inter-agent communication
      5. Reviewer-executor real-time feedback via SendMessage
      6. Full clean code audit of entire codebase
    
      Select which deferred items to carry forward as requirements
      for the next milestone (comma-separated numbers, 'all', or 'none'):
    
  6. Collect user selection. Parse response:
    • all -- carry forward everything
    • none -- carry forward nothing
    • 1,3,5 -- carry forward selected items

Step 9: Prepare Next Version

LOCKED decisions: Semver bump suggestion with user confirmation; config inherited as-is.

  1. Suggest next version:

    • Parse current version string.
    • Suggest semver major bump by default (e.g., v1.0 -> v2.0).
    • Display:
      > Next Version
        Current: {version}
        Suggested: {suggestion}
      
        Next milestone version? (suggested: {suggestion}, or type a version):
      
  2. Ask for milestone name:

    Milestone name? (e.g., 'Second Release'):
    
  3. Confirm version and name with the user before proceeding.

Step 10: Reset State Files

  1. Create fresh ROADMAP.md:

    # Roadmap: {project_name}
    
    ## Overview
    
    {project_name} - {next_version}
    
    ## Phases
    
    (No phases planned yet. Run `/mz:plan` to create a roadmap.)
    
    ## Progress
    
    | Phase | Plans Complete | Status | Completed |
    |-------|----------------|--------|-----------|
    
  2. Create fresh STATE.md:

    # Project State
    
    ## Project Reference
    
    See: .planning/PROJECT.md
    
    **Core value:** {from archived STATE.md}
    **Current focus:** {next_version} - Ready for planning
    
    ## Current Position
    
    Phase: 0 of 0
    Plan: 0 of 0
    Status: Ready for planning
    Last activity: {today} -- Milestone {old_version} archived, starting {next_version}
    
    Progress: [                    ] 0%
    
    ## Performance Metrics
    
    (New milestone -- no metrics yet)
    
    ## Accumulated Context
    
    ### Decisions
    
    (None yet)
    
    ### Pending Todos
    
    (None yet)
    
    ### Blockers/Concerns
    
    (None)
    
    ## Session Continuity
    
    Last session: {today}
    Stopped at: Milestone {next_version} initialized
    Resume file: None
    Stash ref: None
    Last error: None
    
  3. Create fresh REQUIREMENTS.md with selected deferred items as initial requirements:

    # Requirements: {project_name} {next_version}
    
    ## Requirements
    
    | ID | Description | Priority | Status |
    |----|-------------|----------|--------|
    {For each selected deferred item: | NEW-{NN} | {item text} | Medium | Pending |}
    
    (Requirements will be refined during `/mz:plan` roadmap creation.)
    

    If no deferred items were selected, the table has no rows (just the header).

  4. Create new MILESTONE.md via CLI:

    node {plugin_path}/bin/megazord.mjs tools milestone create --version "{next_version}" --name "{name}" --phases ""
    

    Note: phases is empty because the new milestone has no planned phases yet. /mz:plan will populate them.

Step 11: Display Completion

+===============================================+
|  Milestone {old_version} Archived             |
+===============================================+
|  Archived: {N} files to milestones/           |
|  Git tag: milestone/{old_version}             |
|  Deferred items carried: {M} of {total}       |
|  Next milestone: {next_version} - {name}      |
+===============================================+
## Next Up

**Ready for {next_version}: {name}.** Create the roadmap and start planning.
`/mz:plan`

<sub>`/clear` — start fresh context for the next step</sub>

Error Handling

ErrorStepAction
Config missingStep 2Error box, suggest /mz:init. Stop.
ROADMAP.md missingStep 2Error box, suggest /mz:plan. Stop.
No completed phasesStep 3Error: "No completed phases found. Complete at least one phase before running lifecycle." Stop.
Archive already existsStep 6Warning: "Milestone {version} appears already archived." Ask to proceed or abort.
Archive CLI failsStep 7Display error, suggest manual recovery. Stop.
No CONTEXT.md files foundStep 8Skip deferred items: "No deferred items found."
Milestone create failsStep 10Display error with CLI output. State files already reset; suggest manual MILESTONE.md creation.

Notes

  • All CLI commands use the resolved {plugin_path} pattern (from config or fallback ~/.claude/plugins/mz).
  • ALWAYS use bun/bunx for JavaScript/TypeScript operations (never npm/npx).
  • The skill does NOT auto-invoke /mz:plan after completion -- it suggests it as the next step (matches the verify pattern).
  • Configuration (megazord.config.json) is inherited as-is per user decision -- no config review prompt on new milestone.
  • The skill orchestrates existing CLI tools (milestone audit, milestone archive, milestone create, roadmap list, roadmap add-phase). It does NOT reimplement their logic.
  • archiveMilestone() copies files (does not move). Originals remain for gap-closure context. The state reset (Step 10) replaces them with fresh skeletons.
  • archiveMilestone() does not archive STATE.md. The skill handles this manually in Step 7.
  • archiveMilestone() does not update MILESTONE.md status. The skill handles this in Step 7.
  • Gap-closure iteration has no limit. The user runs /mz:lifecycle repeatedly until audit passes.
  • Deferred items are extracted from <deferred> tags in CONTEXT.md files. Phase references are stripped for clean presentation.

Source

git clone https://github.com/Sh3rd3n/megazord/blob/master/skills/lifecycle/SKILL.mdView on GitHub

Overview

Lifecycle orchestrates audit, archive, deferred item collection, and next-version preparation for a milestone. It leverages existing CLI tools (milestone audit, milestone archive, milestone create, roadmap list, roadmap add-phase) to guide users through a complete end-of-milestone flow. If audit finds gaps, it proposes gap-closure phases and exits; if audit passes, it proceeds through archive, deferred items, and next-version prep.

How This Skill Works

It loads planning context from .planning/STATE.md, ROADMAP.md, and MILESTONE.md, then validates and locates the plugin_path. It runs a deterministic sequence of CLI commands via node {plugin_path}/bin/megazord.mjs (milestone audit, milestone archive, milestone create, roadmap list, roadmap add-phase) to produce a real-time milestone status and drive the end-to-end flow. Audit outcomes decide whether to halt for gaps or continue to archive, collect deferred items, and prepare the next version.

When to Use It

  • You need to close the current milestone and start preparing the next version.
  • Audit reveals gaps that require guided gap-closure phases before proceeding.
  • You want a single, guided entry point to perform end-of-milestone actions with consistent formatting.
  • You need to verify planning context and plugin_path before executing milestone commands.
  • You prefer to see a Milestone Status summary before any destructive actions.

Quick Start

  1. Step 1: Ensure planning context exists (.planning/megazord.config.json, STATE.md, ROADMAP.md).
  2. Step 2: Run /mz:lifecycle [--skip-audit] {version} to begin the end-of-milestone flow.
  3. Step 3: Review the Milestone Status banner and proceed with the prompts to archive and prepare the next version.

Best Practices

  • Always review the Milestone Status banner and completed phases before archiving.
  • Use --skip-audit only for informal projects where gaps are acceptable.
  • Keep .planning/*.md files up to date to ensure accurate version detection and phase details.
  • Verify plugin_path is configured and the plugin binary exists before running /mz:lifecycle.
  • If a version isn’t provided, rely on MILESTONE.md version field for automatic detection.

Example Use Cases

  • A product team finishes v2.3 and uses lifecycle to archive the milestone, collect deferred items, and seed v2.4 roadmap phases.
  • An early-stage project uses --skip-audit to accelerate a rapid-cycle milestone when governance approvals are lightweight.
  • A distributed team validates plugin_path from config and runs lifecycle to ensure consistent end-of-milestone output across repos.
  • Deferred items are surfaced during lifecycle, triggering roadmap.add-phase updates for the next release plan.
  • A mature project relies on the Milestone Status summary to communicate progress to stakeholders before archiving.

Frequently Asked Questions